SP012 We’ve designed and manufactured a magnificent 2 foot long, four-sectioned Pontoon Bridge. During the invasions of Poland, France and the Low Countries and Russia permanent bridges were often demolished shelled or bombed before they could be Captured and put to German use. The Wehrmacht became world leaders in developing and constructing a wide range of
temporary emergency bridges to literally fill the gap.